Some of the studies carried out for Quality Control purposes or for deformation monitoring and technical evaluations are listed below. Our detailed reference list will be shared upon request..


Project Name Eminönü- Eyüp Alibeyköy Tram Line Test Measurements
Work Details Compaction Control in Soil Improvements, Bored Pile Integrity Tests, Quality Control Measurement and Preparation of Technical Evaluation Report
Employer/Year Doğuş İnşaat A.Ş.-  2019 -2020
Administration The Istanbul Metropolitan Municipality

Project Name 3 km on Bursa Rail System Line. Ballast Pollution and Sub-Foundation Deformation Study
Work Details Investigation of Ballast Pollution and Deformations by Geodar and Seismic Methods between km 11+805 –km 14+417 on Warehouse Outlet T3, T4 and T1 and T2 lines
Employer/Year Burulaş A.Ş. - 2019
Administration Burulaş A.Ş.
Project Name Çamlıca Kirazlıtepe Neighborhood Landslide Monitoring of deformations
Work Details Tomruk cad.meydana landslide's slip depth, determination of its geometry, monitoring of deformation-displacements and making technical evaluations
Employer/Year Uskudar Municipality - 2017
Administration Uskudar Municipality
Project Name Status determination of Yıldız Shipyard Pier piles
Work Details Preparation of on-site test measurements and technical report for determining the diameter, position and depth of the existing pier piles in Yıldız shipyard
Employer/Year Makyol A.Ş - 2018
Administration Yıldız Ship Machinery Industry. Trade Inc.
Project Name Üsküdar-Çekmeköy Metro Line Geophysical Studies
Work Details Üsküdar - Çekmeköy Metro Line Making on-site measurements and evaluations in deformation areas
Employer/Year Doğuş İnşaat A.Ş - 2013-2016
Administration The Istanbul Metropolitan Municipality
Project Name Basaksehir Esenler Metro Line
Work Details Determining the gaps between the precast used under the rail in the tunnel and the filling concrete between the segment
Employer/Year İstanbul Ulaşım A.Ş - 2018
Administration İstanbul Ulaşım A.Ş
Project Name Basaksehir Esenler Metro Line
Work Details Testing with GPR, a non-destructive measurement method for checking whether there are gaps in the injection spread back-segment
Employer/Year Gülermak A.Ş - 201
Administration The Istanbul Metropolitan Municipality
Project Name TOKİ Bilecik Houses Jetgrout Quality Control
Work Details Geodar Test Measurements and preparation of the technical report for the formation of Jetgrouts under the foundation of Bilecik houses built by TOKİ
Employer/Year TOKİ
Administration Housing Development Administration of the Republic of Türkiye
Project Name Earthquake Performance Analysis of 24 Tax Offices
Work Details Earthquake Performance Analysis of 24 Tax Offices affiliated to the Istanbul Revenue Office
Employer/Year Istanbul Revenue Office 2001
Administration Istanbul Revenue Office
Project Name Edirnekapı-Sultançiftliği Tram Line
Work Details Determination of deformation propagation and soil improvement works on the route where displacements and deformations are seen
Employer/Year İstanbul Ulaşım A.Ş.
Administration İstanbul Ulaşım A.Ş.